KNX for runway lighting

Transportation in Damascus

Applications utilisées

Lighting

Heating, Ventilation & Air conditioning (HVAC)

Security and Safety

Operation and Visualisation

Energy Management/Smart Metering

Other

Automation and Remote Access

Blind and Shutter Control

Détails du projet

Catégorie Valeur
Catégorie de projet Transportation
Type de projet Other
Année d'achèvement 2022
Taille du projet 5.000+
Nombre d'appareils KNX utilisés 26 – 100
Supports de transmission KNX Twisted pair
Heures-hommes 1 – 100
Main-d'œuvre 6 – 10

Mis en vedette dans ce projet

Berker GmbH & Co. KG
Iddero

Description détaillée

Energy Efficiency

The usage of automated functions already save energy in every installation. Especially the usage of KNX has a lot of potential for further energy savings, which can contribute to a better environmental footprint. Be extending KNX to more functions and applications, energy savings of up to 60% can be realised. Thanks to the flexibility of KNX, these functions can easily be implemented in this installation

Innovation

Smart homes and buildings are always an upgrade in comparison to a conventional installation. Not only automated functions and a higher level of comfort contribute to a higher living standard, but also the possibility to be ready for coming innovations. Thanks to the usage of KNX, the door has been opened to integrate new innovative solutions, using the worldwide STANDARD for home and building control.

Applications utilisées

  • Lighting - Switching, Dimming, Light Scenes, Constant Light Control
  • Heating, Ventilation & Air conditioning (HVAC)
  • Security and Safety
  • Operation and Visualisation
  • Energy Management/Smart Metering
  • Other
  • Automation and Remote Access
  • Blind and Shutter Control

Description des clients

The idea is link the traffic control tower at one of the airports land with the lighting of the runway via knx system in this project we use of a previously existing optical cable for other purposes to transmit the control signal between the tower and The runway for a distance more than 5 km In this way, we have achieved great savings, ease of use and monitoring of the condition of the landing strips After the implementation of this project after they were approved by air traffic controllers

Coordonnées

Nom de l'entreprise Dassouki Group
E-mail de l'entreprise basel@dassouki.com.sy
Company Website
Nom du contact Basel alattar
Fonction de contact Installer