Bank of Development in Vitebsk, Belarus

Office building in Vitebsk

Applications utilisées

Éclairage

Chauffage, ventilation et climatisation (CVC)

Sécurité et sûreté

Commande et visualisation

Gestion de l'énergie / Comptage intelligent

Autre

Automatisation et accès à distance

Commande de stores et de volets

Détails du projet

Catégorie Valeur
Catégorie de projet Office building
Type de projet Commercial
Année d'achèvement 2017
Taille du projet 1.001 – 5.000
Nombre d'appareils KNX utilisés 101 – 300
Supports de transmission KNX IP
Heures-hommes 2.000+
Main-d'œuvre 6 – 10

Mis en vedette dans ce projet

ABB AG - STOTZ-KONTAKT
ABB AG - BUSCH-JAEGER
HMS Industrial Networks SLU
Zennio Avance y Tecnología s.l.

Description détaillée

Energy Efficiency

The usage of automated functions already save energy in every installation. Especially the usage of KNX has a lot of potential for further energy savings, which can contribute to a better environmental footprint. Be extending KNX to more functions and applications, energy savings of up to 60% can be realised. Thanks to the flexibility of KNX, these functions can easily be implemented in this installation

Innovation

Smart homes and buildings are always an upgrade in comparison to a conventional installation. Not only automated functions and a higher level of comfort contribute to a higher living standard, but also the possibility to be ready for coming innovations. Thanks to the usage of KNX, the door has been opened to integrate new innovative solutions, using the worldwide STANDARD for home and building control.

Applications utilisées

  • Éclairage
  • Chauffage, ventilation et climatisation (CVC)
  • Sécurité et sûreté
  • Commande et visualisation
  • Gestion de l'énergie / Comptage intelligent
  • Autre
  • Automatisation et accès à distance
  • Commande de stores et de volets

Description des clients

The task of this project was to reconstruct an old historical building for placing a modern branch of a bank, so it required reliability, safety and functionality. The project was carried out by two companies - DAR-electro LLC and Modern City LLC.

Coordonnées

Nom de l'entreprise DAR-electro LLC , Modern City LLC
E-mail de l'entreprise alexander.zalesskiy@dar-electro.com
Site web de l'entreprise http://www.dar-knx.by
Nom du contact Alexander Zalesskiy
Fonction de contact System Integrator