Cairns Performing Arts Centre

Entertainment in Cairns

Applications utilisées

Éclairage

Chauffage, ventilation et climatisation (CVC)

Sécurité et sûreté

Commande et visualisation

Gestion de l'énergie / Comptage intelligent

Autre

Automatisation et accès à distance

Commande de stores et de volets

Détails du projet

Catégorie Valeur
Catégorie de projet Entertainment
Type de projet Commercial
Année d'achèvement 2018
Taille du projet 1.001 – 5.000
Nombre d'appareils KNX utilisés 101 – 300
Supports de transmission KNX Twisted pair
Heures-hommes 251 – 500
Main-d'œuvre 11 – 25

Mis en vedette dans ce projet

ABB AG - STOTZ-KONTAKT
Hager Controls
BAB TECHNOLOGIE

Description détaillée

Energy Efficiency

The usage of automated functions already save energy in every installation. Especially the usage of KNX has a lot of potential for further energy savings, which can contribute to a better environmental footprint. Be extending KNX to more functions and applications, energy savings of up to 60% can be realised. Thanks to the flexibility of KNX, these functions can easily be implemented in this installation

Innovation

Smart homes and buildings are always an upgrade in comparison to a conventional installation. Not only automated functions and a higher level of comfort contribute to a higher living standard, but also the possibility to be ready for coming innovations. Thanks to the usage of KNX, the door has been opened to integrate new innovative solutions, using the worldwide STANDARD for home and building control.

Applications utilisées

  • Éclairage
  • Chauffage, ventilation et climatisation (CVC)
  • Sécurité et sûreté
  • Commande et visualisation
  • Gestion de l'énergie / Comptage intelligent
  • Autre
  • Automatisation et accès à distance
  • Commande de stores et de volets

Description des clients

The Cairns Performing Arts Centre is a joint initiative of Cairns Regional Council, the Queensland Government through Arts Queensland and the Australian Government. CPAC replaces the former Cairns Civic Theatre providing a greatly enhanced audience experience and a state-of-the-art facility that will support our local performers. The $71 million project took about 2 years to construct. The main components of CPAC are: A 941 seat main auditorium incorporating balcony seating A significantly increased foyer, bar area and public amenities A studio theatre that can double as a 400-seat performance space, rehearsal and warm-up area Improved back of house facilities, including more change rooms and toilets, a cross over, higher and covered loading bay A deeper stage, more spacious wings, higher proscenium arch, higher fly tower and more fly lines A much larger orchestra pit and providing better piano storage Improve acoustics.

Coordonnées

Nom de l'entreprise SyncWise Smart Building Solutions
E-mail de l'entreprise info@syncwise.com.au
Site web de l'entreprise http://www.syncwise.com.au/
Nom du contact Roy Baharal
Fonction de contact System Integrator